Sam India casts first pier cap for 1C, 1D phases of Jaipur metro
Sam (India) Builtwell Pvt Ltd started casting the first pier cap for Phases 1C and 1D of Jaipur Metro within package JP/EW/1C&1D(Elevated)/02R. Jaipur Metro's Phase 1C involves extending the Pink Line from Badi Chaupar to Transport Nagar and Phase 1D involves extending the Pink Line from Mansarovar to Ajmer Road Chauraha, with a total length of 1.312 km (all elevated).