Titagarh Rail receives LoA for Mumbai metro contract
Titagarh Rail Systems Limited has received a LoA from Mumbai Metropolitan Region Development Authority (MMRDA) for the design, manufacture, supply, and commissioning of 132 metro coaches, along with associated systems, for the Mumbai Metro Line 5 project. Line 5 of the Mumbai Metro spans 24.90 km from Thane to Bhiwandi through 15 stations and will be implemented in two phases.