A section of the boundary wall of the newly constructed Rewa Airport in Madhya Pradesh, built at a cost of ₹500 crore, collapsed just few months after completion. A similar breach was reported during the rains last year, even before the airport became operational, locals said. The airport was completed in a record 18 months on 323 acres of land.
short by
Subhangi Singh /
09:32 am on
13 Jul