Baker Hughes (BKR) signed a deal with Bechtel Energy to supply liquefaction equipment for Train 5 of the Rio Grande LNG Facility in Texas. The package includes two Frame 7 gas turbines, six compressors, and low-emission technology. This award, part of a broader framework for Trains 4–8, follows its September order for Train 4 and integrates the Cordant Asset Health solution.
short by
/
07:01 pm on
06 Nov