Paras Railtech Private Limited has received a Letter of Acceptance (LoA) for the second ballastless track contract, CA-273, of the Mumbai Metro Line 2B (Yellow Line), valued at ₹99.9 Crore. This line spans 23.6 km between Andheri West and Mandale. The contractor will be responsible for the installation of standard gauge ballastless track between Andheri West and ITO Station.
short by
/
01:44 pm on
12 Aug