Reliance Infrastructure rose 3.6% after bagging a Letter of Award from NHPC to build a 390 MW ISTS-connected solar plant with 780 MWh battery storage. The tariff was discovered at ₹3.13/kWh, amid strong auction demand. The deal boosts Reliance's clean energy pipeline to 3 GWp solar and 3.5 GWh BESS, even as the stock remains 11% lower YTD.
short by
/
12:05 pm on
19 Aug