The third rail testing, a critical electrification trial, began by the Bangalore Metro Rail Corporation Limited (BMRCL) on the elevated segment of the Pink Line. The test contributes to energising locomotives on the Pink Line's section between Jayadeva and Tavarekere metro stations. This under-construction metro corridor spans 21.386 km between Kalena Agaraha and Nagawara through 18 stations.
short by
/
03:52 pm on
19 Jun