Madhya Pradesh CM Mohan Yadav on Thursday said action will be taken against those responsible for technical flaws in construction of railway overbridge with a 90-degree turn in Bhopal. The work of rectifying technical faults has started, and it will be inaugurated only after work is done, he added. The bridge was built at a cost of over ₹18 crore.
short by
Subhangi Singh /
07:28 pm on
26 Jun